The Maple/Oregon Street Bridge in Sturgeon Bay was closed for about an hour Monday morning while a number of test openings were conducted. The structure, which opened in September of 2008, recently had new computer equipment installed and the testing was done as a means of determining how the electronics were functioning. The series of openings began around 9AM and was completed shortly 10AM.